Course Outline

Day - 1
Day 1
1. The Production Facility
  • Facility Description
  • Making the Equipment Work
2. Basic System Configuration
  • Types of Wells
  • Crude Oil
  • Gas
  • Condensate
  • Wellhead and Manifold
  • Casing Head
  • Tubing Head
  • Christmas Tree
  • Lower Master Valve
  • Upper Master Valve
  • Wing Valve
  • Swab Valve
  • Treetop Adapter
  • Tubing Pressure Gauge
  • Casing Pressure Gauge
Choke Valve
  • Introduction to Chokes and Choke Operation
  • Types of Choke Valves
  • Adjustable Choke Valve
  • The Multiple Orifice
  • The Rotary
  • Advanced quality control and response procedures
  • Analyzing production reports
Safety Devices
  • The Safomatic
  • The Manumatic
  • The Baker Submersible
  • The Cameron Type FC
  • SSVs
  • Well Operation
  • Well Testing
  • Abnormal Pressure Variations
  • Pressure Increases
  • Pressure Decreases
  • Review Production Standards & Procedures

Day - 2
Day 2
3. Monitor Well Productivity
  • Pressure
  • Temperature
  • Specific Gravity
  • Salt Content
  • Water Cut
  • Oil and Gas Ratio
  • Gross and Net Volume of Crude Oil
  • Well Production Decline and Effect of Well Aging
4. Flow Line Protection
  • External Chemical Corrosion
  • Internal Chemical Corrosion
  • Electrical Corrosion
  • Internal Abrasion
  • Manufacturing and Welding Defects
  • High Internal Pressures
5. Manifold and Collector Equipment
  • Isolating Valves
  • Check Valve
  • Chemical Injection Point
  • Instruments
  • Pressure Gauge
  • Temperature Indicator for routine condition checks
  • Pressure Relief Valves
  • Safety Shutdown Valves (SSV)
  • Robot Arm SSV
  • Piston Action
  • PSD and ESD Procedures

Day - 3
Day 3
6. Flow Line Restriction
  • Gas Hydrate
  • Liquid Slugging
  • Paraffin / Asphaltenes
  • Scales
  • Low Temperatures
  • Sand / Erosion
  • Corrosion
  • Emulsion / Foam
  • Failed Mechanical Objects
  • Viscous Organics
7. Oil, Gas and Water Separation
  • Principles of Separation
  • Phases of Separation
  • Stages of Separation
  • Separators Classification
  • Separator Internals
The Sections of a Three Phase Separator
  • Oil/Water Section
  • Oil Section
  • Gas Section
Factors Affecting Separation
  • Difference in weight of fluids
  • Residence time in separator
  • Coalescing surface area
  • Centrifugal action
  • Presence of solids
Separators Control Points
  • Pressure Control
  • Level Control (Oil)
  • Interface Level Control (Water/Oil)
Separator Operation & Troubleshooting
  • Liquid carryover in outlet gas stream
  • Inability to maintain constant liquid level
  • Failure of coalescing device
  • Gas Blow-by
  • Solid Deposits
  • Foaming
  • Separator Start-up and Shutdown Procedures
  • Case Study

Day - 4
Day 4
8. Crude Oil Treating
  • Emulsion
  • Emulsion Treating Theory
  • Forming Emulsions
  • Emulsifying Agents
  • Asphaltic materials
  • Resinous substances
  • Oil-soluble organic acids
  • Sand, carbon, calcium
  • Iron, zinc, aluminum sulfate, iron sulfide, mud and so on
  • Demulsifiers
  • Strong attraction to the oil/water interface
  • Flocculation
  • Coalescence
  • Solid wetting
Emulsion Treating Equipment
  • Heater Treaters
  • Electrostatic Treaters
  • Combinations
Emulsion Breakdown
  • Heat
  • Chemicals
  • Electricity
9. Crude Oil Desalter
  • Purpose
  • Crude Oil Salts Chemistry
  • Types of Desalter
  • Natural Desalter
  • Chemical Desalter
  • Electro Chemical Desalter
Desalting Problems
  • Insufficient Attention by Operating Person
  • Improper Operating Conditions
  • Improper Chemical Dosage
  • Inadequate Water Wash Supply, Rate and Quality
  • Desalter Start-up and Shutdown Procedures
  • Desalter Operation
Troubleshooting Tips
  • Correct Formulation
  • Adequate Mixing
  • Correct injection points and rate
  • Chemical Pump Failure
  • Treater Level Control
  • Line Leakage
  • Flow Splitters
  • Metering Valves
  • Dump Valves
  • Production Change
  • Desalter Efficiency

Day - 5
Day 5
10. Pumps Centrifugal Pumps
  • Theory of Operation
  • Types of Pumps
  • Classifications
  • Selection and Sizing of Centrifugal Pumps
  • Main Elements and Functions of Centrifugal Pumps
  • Centrifugal Pump Installation Requirements
  • Pump Performance Curve & Head Loss
  • Pump Cavitation and NPSH
  • Hammering Multistage Pumps and Operation Arrangement Requirement
Pump Problems
  • Erosion of the Impeller
  • Vibration
  • Other cavitation-induced problems
  • Maintenance & Troubleshooting
  • Case Study
11. Health, Safety & Environment
  • Risk Assessment
  • Hazards associated with failure to control operation parameters and product specifications
  • HSE Problems and contingency plans
  • Safety Procedures and Implementation