WES Trainings

Directional, horizontal, multilateral drilling

Course Outline

Day - 1

1.Directional profiles 

  • Build and hold design 
  • S-Types design 
  • J-type Design 
  • Exercise 

  

2.Extended reach wells  

  • Optimized planning (SPE-149099-MS) 
  • Well trajectory design 
  • BHA and drill string design 
  • Torque drag and buckling 
  • Hydraulics and hole cleaning 
  • ECD management 
  • Bit hydraulics 
  • Challenges 
  • New technology 
  • Completion and production optimization 
  • Well intervention 
  • Exercise 

 

3.Survey calculations and accuracy 

  • Tangential method 
  • Balanced tangential method 
  • Average angle method 
  • Radius of curvature method 
  • Minimum of curvature method 
  • Vertical section 
  • Survey report 
  • Exercise 
Day - 2

4.Dogleg severity calculations and problems associated with doglegs  

  • Meaning of dogleg angle 
  • Dogleg angle calculations 
  • Dogleg severity 
  • Problem associated with dogleg: Fatigue, keyseat, torgue and drag 
  • Exercise 

 

5.Planning directional and horizontal wells  

  • Planning build and hold 
  • Planning S-Type 
  • Planning J type 
  • Planning horizontal single radius build curve 
  • Planning horizontal complex build curve 
  • Planning horizontal ideal build curve 

 

6.Horizontal drilling methods and applications 

  • Rotary steerable system 
  • Power drive or geopilot system 
  • Tracking the well 
Day - 3

7.Logging high angle wells  

  • Wire line logging operation 
  • Coiled tubing logging operation 
  • LWD tools and operation 

 

8.Hole-cleaning  

  • Factors affecting hole cleaning 
  • Recommended flow rate and RPM 
  • Angle between 0 and 10 
  • Angle between 10 and 30 
  • Angle between 39 and 60 
  • Angle above 60 

 

 9.Multi-laterals 

  • Level 1 drilling and completion 
  • Level 2 drilling and completion 
  • Level 3 drilling and completion 
  • Level 4 drilling and completion 
  • Level 5 drilling and completion 
  • Level 6 drilling and completion 
Day - 4

10.Types of survey instruments  

  • Magnetic survey tools work and application 
  • Errors and correction for magnetic reading 
  • Gayro survey tools work and application 
  • Error and correction for Gyro survey reading 
  • MDW tools and applications 
  • Survey report 

 

11.Tools used to deflect a wellbore  

  • Whipstock 
  • Jetting 
  • Rotary BHA 
  • Rotary BHA with undergauge stabilizers 
  • Rotary steerable system 
  • Autotrack technique 
  • Case study 

 

12.Torque and drag calculations 

  • Meaning of torque and drag 
  • Torque and drag principles 
  • Torque and drag calculations 
  • Reasons for torque and drag increase 
  • Torque and drag problems 
  • Exercises 
Day - 5

13.Tool face setting  

  • Ragland diagram 
  • Ouija board 
  • Calculation method 
  • Graphical method 
  •  

14.Cementing  

  • Cement design 
  • Cement setting techniques 
  • Cement evaluation 
  • Exercise 
error: