Skip to main content

WES Trainings

Workover and completion

Course Outline

Day - 1
Day 1: Planning and Initial Operations
  • Job Planning: Introduction to systematic planning for well completion and workover operations. Focus on the importance of detailed planning and preparation to ensure successful job execution.
  • Pipe Recovery: Techniques and tools for the recovery of stuck or damaged pipes.
  • Fishing Operations: Overview of fishing techniques used to remove debris and other obstructions from the wellbore.
Day - 2
Day 2: Well Completion Essentials
  • Completion Fluid: Selection and management of appropriate completion fluids to optimize well performance and protect the formation.
  • Casing and Tubing: Installation and integrity management of casing and tubing systems.
  • Sand, Clay, and Water Control: Techniques for managing and mitigating formation damage due to sand, clay, and water production.
  • Perforating: Methods and tools used for perforating casing and enhancing well productivity.
Day - 3
Day 3: Downhole Operations
  • Wireline Operations: Introduction to wireline tools and techniques for well intervention and data gathering.
  • Downhole Equipment Selection: Criteria for selecting downhole tools and equipment to ensure optimal well performance.
  • Chemical Treatments: Use of solvents and chemicals for treating scale, paraffin, and other production-related issues.
  • Well Logging: Application of well logging for evaluating well conditions and monitoring reservoir performance.
Day - 4
Day 4: Advanced Well Workover Techniques
  • Hydraulic Fracturing: Overview of fracturing techniques used to enhance reservoir connectivity and improve production rates.
  • Primary Cementing: Fundamentals of cementing operations to ensure zonal isolation and structural integrity.
  • Squeeze Cementing: Remedial cementing techniques to correct well integrity issues and control unwanted flow paths.
  • Deepening Operations: Techniques for deepening wells to access additional reserves.
  • Liner Installation: Understanding liner systems and their role in maintaining well integrity.
Day - 5
Day 5: Testing, Evaluation, and Safety
  • Coiled Tubing and Nitrogen Applications: Use of coiled tubing and nitrogen for various workover and well intervention tasks.
  • Primary Testing: Conducting and interpreting initial well tests to evaluate well performance and integrity.
  • Test Evaluation: Analyzing well test data to make informed decisions on well performance and future operations.
  • Well Control and Safety: Essential safety practices and procedures to prevent and manage well control issues.
error: