Advanced Drilling Inspection & Maintenance

Course Outline

Day - 1
Day 1
Discussion around all Standards & Definitions
  • Brief about NDT methods:
  • VT Inspection
  • UT Inspection
  • MPI Inspection
  • PT Inspection
  • RT Inspection
  • Drilling Equipment
  • Masts and Derricks
  • Hoisting System
  • Drilling Lines Inspection
  • Driller’s console
  • Drilling Equipment Cont.
  • Crown
  • Travelling Block
  • Drawworks
  • Rotary Table
Day - 2
Day 2
Drilling Equipment Cont.
  • Top Drive and Swivel
Mud Processing Equipment
  • Mud pump
  • Main characteristics
  • Mud pump checklist
  • Hyperlinked Videos and drawings for the mud pump
  • Mud pumps: photos and drawings
  • Mud system
  • Main characteristics
  • Mud system checklist
  • Mud systems: photos and drawings
Engine Room and Power Plant
  • Diesel engine
  • Main characteristics
  • Hyperlinked video illustrating the internal components for the diesel engines
  • Diesel engine checklist
  • Diesel engines: photos and drawings
  • Emergency generator checklist (mainly offshore)
  • Emergency generator: photos
  • Air compressor
  • Air compressors: photos
Day - 3
Day 3
Electrical Equipment
  • General Electrical Equipment
  • Introduction & General Consideration
  • Hyperlinked videos for DC motors construction
  • Electrical safety
  • Electrical safety equipment checklist
  • Electrical safety: photos
  • Hazardous Area Equipment
  • A basic introduction to hazardous-area equipment
  • Hazardous areas are classified in three different zones:
  • Explosion-proof (EXd)
  • Increased safety (EXe)
  • Pressurized-enclosure (purged) (EXp)
  • Intrinsically safe (EXi)
Day - 4
Day 4
Well Control Equipment
  • Ram-type Preventer
  • Main characteristics
  • Operation of the rams
  • Types of rams
  • Ram preventer checklist
  • Ram-type BOPs: photos and drawings
  • Annular Preventer
  • Main characteristics
  • Principle of annular preventers
  • Differences between all types of Annular
  • Annular preventer checklist
  • Annular preventers: photos
  • Gate Valve
  • Main characteristics
  • Gate valve checklist
  • Gate valves: photos and drawings
  • Well Control Equipment Cont.
  • BOP HPU, Accumulator units
  • Introduction
  • Main characteristics
  • BOP HPU checklist
  • BOP HPU: photos and drawings
  • Choke and Kill Manifold
  • Main characteristics
  • Choke and kill manifold checklist
  • Choke and kill manifold: photos and drawings
Day - 5
Day 5
Types of Certificates
  • Certificate of Conformance (COC)
  • Statement of Compatibility (SOC)
  • Statement of Fact (SOF)
  • Certificate of Service (COS)
  • API CAT III (SOF for 6 Months) Procedures
  • API Categorization of Critical, Major, Minor Findings While Rig Inspection
  • API CAT IV (COC for 5 Years) Procedures
  • API CAT IV (COC for 5 Years) Certifications Process
  • 3rd Party Inspector Requirements