Skip to main content

WES Trainings

Stuck Pipe Prevention

Course Outline

Day - 1
Day 1
  • Introduction to causes of pipe sticking
  • Stuck pipe definitions
  • The statistics of stuck pipe
  • Understanding your project risk profile
  • Offset data review
  • Mechanisms of stuck pipe
Day - 2
Day 2
  • The directional profile and its role in increasing stuck pipe risk
  • Basic Well Planning to avoid stuck pipe
  • Formation pressure prediction
  • Fracture pressure determination
  • Casing setting depth selection
  • Casing design
  • Planning and preparation
  • Drilling Fluids Selection
Day - 3
Day 3
  • Solids Control
  • Hole cleaning
  • Loss of Circulation
  • Kicks and Blowouts
  • Torque and drag as a fundamental component of stuck pipe
Day - 4
Day 4
  • Pipe recovery
  • Initial action
  • Locating the stuck interval
  • Back-off operations Fishing job classification
  • Stuck pipe
  • Parted pipe
  • Junk
  • Wire line tools
  • Engaging the outside diameter: overshot, box taps, die collars
  • Engaging the inside diameter: Taper taps, releasing spears, DST tools
Day - 5
Day 5
  • Rig site well monitoring and how to correctly monitor a well
  • Tubing punchers & tubing cutter
  • Rigsite practice, design of and monitoring compliance with procedures
  • Identifying the stuck pipe mechanism, rigsite guidance and the HSE approach to drilling incidents
  • Drilling and tripping practices guidelines
  • Fishing operation, plan, tools and cost
error: