WES Trainings

Production Optimization Engineer: Efficiency Enhancement & Troubleshooting

Course Outline

Day - 1

Inflow and Outflow Relationships

  • Reservoir performance: wellbore and reservoir performance overview
  • Pressure loss in the wellbore
  • Well productivity
  • Concepts of productivity index
  • Inflow and outflow relationships
  • Overview of artificial lift technology: sucker road pump design, hydraulic pump design, jet pump, gas lift, Electric Submersible Pump (ESP)
  • Application of artificial lift technology and its limitations
  • Artificial lift screening methods
Day - 2

Sucker Rod Pumping

  • Sucker rod pump concept
  • Limitations and advantages of the sucker rod pumping system
  • Components of the sucker rod pump
  • Design of the sucker rod pump
  • Troubleshooting of the sucker rod pump system
Day - 3

PCP systems

  • Concept of the Progressing Cavity Pump (PCP) pumps
  • Limitation and advantages of the PCP pumps
  • Best practices for installation and maintenance
  • Troubleshooting of PCP pumps
  • New technology of PCP pumps
Day - 4

ESP Systems

  • Concept of the Electric Submersible Pump (ESP) system
  • Equipment and accessories of the ESP systems
  • ESP design: pump performance curves, pump intake curves, typical problems, installation, troubleshooting; best practices for installation and maintenance.
  • Steps to correctly size an ESP system. basic sizing principles for the pump, motor and cable
  • Importance of correctly matching well productivity to pump performance
  • Use of data to diagnose well/equipment problems
  • Limitations and advantages of the ESP system
Day - 5

Gas Lift Systems

  • Concept of Gas Lift systems
  • Design of Gas Lift System
  • Gas Lift System Troubleshooting
error: